Agenda, decisions and minutes
Venue: Boardroom - Brent Civic Centre, Engineers Way, Wembley, HA9 0FJ. View directions
Contact: Anne Reid, Principal Democratic Services Officer 020 8937 1359, Email: anne.reid@brent.gov.uk
No. | Item |
---|---|
Declarations of personal and prejudicial interests Members are invited to declare at this stage of the meeting, any relevant financial or other interest in the items on this agenda. Minutes: None. |
|
Minutes of the previous meeting PDF 116 KB Minutes: RESOLVED:
that the minutes of the previous meeting held on 14 October 2013 be approved as an accurate record of the meeting. |
|
Matters arising Minutes: None. |
|
Order of business Minutes: The Executive agreed to change the order of business to take earlier in the meeting those items for which members of the public were present. |
|
Deputation - HRA Asset Management Strategy Minutes: With the consent of the Executive, Pete Firmin (representing Brent Fightback) addressed the meeting expressing concern over the HRA Asset Management strategy. He felt there was a general lack of clarity over the policy both with the public and members and that the lack of support by tenants was not accurately reflected in the outcome of the consultation. He also expressed concern at the extent to which new builds would be affordable at a time when many were experiencing higher costs of living. He drew comparisons proposals in LB Islington. Mr Firmin felt that the council’s announcement of no increases in Council Tax levels was misleading if tenants were having to pay increased rents and to finance new builds. Mr Firmin and stressed the need for social and not market rents levels. |
|
Housing Revenue Account - Asset Management Strategy PDF 121 KB The HRA Asset Management Strategy sets a long-term approach to the maintenance and development of the Council’s housing assets in order to best meet its housing objectives. Additional documents: Decision: (i) that approval be given to the HRA Asset Management Strategy which is appended to the report and authorise its implementation from 1 April 2014; (ii) that agreement be given to an indicative five-year capital budget of £86.3m for stock investment, with the final budget being reported annually to the Executive for approval; (iii) that approval be given to proceed with an initial programme for the development of between 75 and 100 new affordable homes within the HRA estate for let at Affordable Rents with local consultation and scheme development to be managed by Brent Housing Partnership and with the final schemes to be subject to approval by the Executive; (iv) that capital receipts that are realised from the disposal of HRA stock be ring-fenced for the development and acquisition of affordable housing through the HRA subject to annual approval in the capital programme, and that replacement receipts that have arisen from Right-to-Buy sales since April 2012 and that arise in the future, are additionally ring-fenced for the development or acquisition of affordable housing through the HRA; (v) that further examination is made of approaches to maximise the provision of new affordable housing with the intention being to develop one thousand affordable homes, including replacement homes, from 2014-2022, with this including examination of the use of corporate land-holdings, prudential borrowing, the contribution of BHP and relevant partnership arrangements to achieve this, and to report further to the Executive in respect of specific projects in relation to this; (vi) that approval be given to the rent policy set out in the Asset Management Strategy for the period 2014-19 with actual rent increases being subject to annual approval by the Executive; (vii) that under the HRA prudential borrowing regime, additional HRA borrowing of up to £20.6m be approved, to be used by March 2016. (viii) that it be noted that the responses to the consultation regarding the draft HRA Asset Management Strategy which are set out in Appendix 2 to this report; (ix) that the content of the Equality Impact Assessment which is set out in Appendix 3 to the report be noted. Minutes: The report from the Strategic Director of Regeneration and Growth set out a long-term approach to the maintenance and development of the council's housing assets in order to best meet its housing objectives. A draft of the strategy was agreed in July for consultation to proceed on the approach proposed. Brent tenants and leaseholders and the wider public were consulted on the draft strategy over an eight week period from early August to early October and it was felt that there was a high-level of endorsement for the approach proposed in the draft strategy and responses received were taken into account in finalising the strategy.
The Chair (Councillor Butt, Leader of the Council) responded to representations heard earlier in the meeting and drew attention to the council’s difficult financial position and housing regeneration activity taking place around the borough to improve people’s lives for example in South Kilburn, Alperton and Barham Park. Councillor McLennan (Lead Member, Housing) in introducing the report, welcomed the intention to build affordable new homes and the planned medium term approach to meeting objectives. Regarding the consultation, Councillor McLennan reported that this had been widespread and there was a high level of endorsement for most aspects of the strategy. The rent policy proposed ensured existing tenants were the subject of only modest rent rises, that the new homes built would be affordable, and that there would be sufficient income generated to both improve existing homes and build new council housing.
Andrew Donald (Strategic Director, Regeneration and Growth) clarified the position on rents which would not actually be set for 2014/15 until February 2014. Social rent levels for existing tenants would be maintained in accordance with the government’s existing rent convergence policy. Any new homes that made use of government grant will be required to charge an ‘affordable rent’, at between 60-80% of the average market rents.
Councillor Pavey (Lead Member, Children and Families) stated that advance notice of the report coming to the Executive had been given both in the consultation and on the council’s forward plan and regretted that concerns expressed earlier in the meeting had not been raised earlier for proper discussion. He acknowledged that the strategy was having to respond to exceptionally challenging circumstances and that Brent was facing some very difficult housing choices driven by ongoing increases in private sector rents and increasing numbers of homeless applications.
RESOLVED:
(i) that approval be given to the HRA Asset Management Strategy which was appended to the report from the Strategic Director of Regeneration and Growth and its implementation from 1 April 2014 be authorised;
(ii) that agreement be given to an indicative five-year capital budget of £86.3m for stock investment, with the final budget being reported annually to the Executive for approval;
(iii) that approval be given to proceed with an initial programme for the development of between 75 and 100 new affordable homes within the HRA estate for let at Affordable Rents with local consultation and scheme development to be managed ... view the full minutes text for item 6. |
|
Supporting People Services - accident prevention PDF 281 KB This report seeks the approval of the Executive to award a contract for the provision of Accident Prevention and Handyperson Service as required by Standing Order 88(c). This report summarises the results of the procurement process undertaken by Brent officers and following completion of the evaluation recommends a contractor for award of the proposed contract. The report also sets out the financial implications and other benefits associated with the contract. Additional documents:
Decision: (i) that approval be given to the award of the contract for Supporting People - Accident Prevention and Handyperson Service to Elders Voice for an initial contract period of two (2) years with the option to extend for a further period of one (1) plus one (1) years. (ii) that it be noted that the value of the contract for the provision of Accident Prevention and Handyperson Services is estimated to be circa £137,000 per annum for up to four year duration of the contract over the contract period stated at paragraph (i) above. (iii) that it be noted the successful bidder is also the incumbent and therefore no transition period for contract implementation is required. Minutes: The report from the Acting Director Adult Social Services sought approval to award a contract for the provision of Accident Prevention and Handyperson Service as required by Standing Order 88(c). The report summarised the results of the procurement process undertaken by Brent officers and following completion of the evaluation recommended a contractor for award of the proposed contract. The report also set out the financial implications and other benefits associated with the contract.
Councillor Hirani (Lead Member, Adults and Health) stated that the successful bidder had been competitive both in terms of price and quality and he was pleased the council would be able to continue to offer more services to vulnerable and elderly people.
The Executive also had before them an appendix to the report which was not for publication as it contained the following category of exempt information as specified in Schedule 12 of the Local Government (Access to Information Act) 1972:
Information relating to the financial or business affairs of any particular person (including the authority holding that information).
RESOLVED:
(i) that approval be given to the award of the contract for Supporting People - Accident Prevention and Handyperson Service to Elders Voice for an initial contract period of two years with the option to extend for a further period of one plus one years;
(ii) that it be noted that the value of the contract for the provision of Accident Prevention and Handyperson Services is estimated to be circa £137,000 per annum for up to four year duration of the contract over the contract period stated at paragraph (i) above;
(iii) that it be noted the successful bidder was also the incumbent and therefore no transition period for contract implementation is required. |
|
Supporting People Services - emergency response PDF 151 KB This report seeks the approval of the Executive to award a contract for the provision of Supporting People - Emergency Response as required by Standing Order 88(c). This report summarises the results of the procurement process undertaken by Brent officers and following completion of the evaluation, recommends a provider for award of the proposed contract. The report also sets out the financial implications and other benefits associated with the contract. Additional documents:
Decision: (i) that approval be given to the award of the contract for Emergency Response to the Barnet Group for an initial contract period of two (2) years with the option to extend for a further period of one (1) plus one (1) years; (ii) that it be noted that the value of the contract for the provision of Emergency Response Service is estimated to be circa £100,000 per annum for the contract period stated at paragraph (i) above. Minutes: Councillor Hirani (Lead Member, Adults and Health) introduced the report which sought approval to award a contract for the provision of Supporting People - Emergency Response as required by Standing Order 88(c). The report summarised the results of the procurement process undertaken by Brent officers and following completion of the evaluation, recommended a provider for award of the proposed contract the former having expired in March. Councillor Hirani referred to the financial implications and other benefits including activities associated with the contract. Councillor R Moher welcomed the award of the contract to Elders Voice, a local organisation.
The Executive also had before them an appendix to the report which was not for publication as it contained the following category of exempt information as specified in Schedule 12 of the Local Government (Access to Information Act) 1972:
Information relating to the financial or business affairs of any particular person (including the authority holding that information).
RESOLVED:
(i) that approval be given to the award of the contract for Emergency Response to the Barnet Group for an initial contract period of two years with the option to extend for a further period of one plus one years;
(ii) that it be noted that the value of the contract for the provision of Emergency Response Service is estimated to be circa £100,000 per annum for the contract period stated at paragraph (i) above. |
|
Registered Children's Homes Block Contract PDF 101 KB This report requests approval to participate in a collaborative procurement with local authorities within the West London Alliance for the procurement of a 12 bed block contract for therapeutic children’s homes placements as required by Contract Standing Order 85. If agreed officers will present a further report at the tender award stage for member’s approval prior to contract award. Additional documents:
Decision: (i) that approval be given to participate in a collaborative procurement of a 12 bed block contract for therapeutic children’s homes placements led by one of the other West London Alliance boroughs; (ii) that approval be given to the collaborative procurement exercise described in paragraph (i) being exempted from the normal requirements of Brent’s Contract Standing Orders in accordance with Contract Standing Orders 85(c) and 84(a) on the basis that there are good financial and operational reasons as set out in paragraph 3.4 to 3.8 of the report. Minutes: Councillor Pavey (Lead Member, Children and Families) introduced the report which requested approval to participate in a collaborative procurement with local authorities within the West London Alliance for the procurement of a 12 bed block contract for therapeutic children’s homes placements. The initiative was designed to reduce spending on externally commissioned placements and to be more proactive. Costs would be reduced through economies of scale and travel costs with savings of £3.2M over three years. Councillor R Moher (Lead Member, Resources) suggested that during negotiations, efforts be made to press for a better deal for the council given that there are no children’s homes in the borough. The Executive noted that a further report at the tender award stage would be presented for approval prior to contract award.
The Executive also had before them an appendix to the report which was not for publication as it contained the following category of exempt information as specified in Schedule 12 of the Local Government (Access to Information Act) 1972:
Information relating to the financial or business affairs of any particular person (including the authority holding that information).
RESOLVED:
(i) that approval be given to participate in a collaborative procurement of a 12 bed block contract for therapeutic children’s homes placements led by one of the other West London Alliance boroughs;
(ii) that approval be given to the collaborative procurement exercise described in paragraph (i) being exempted from the normal requirements of Brent’s Contract Standing Orders in accordance with Contract Standing Orders 85(c) and 84(a) on the basis that there are good financial and operational reasons as set out in paragraph 3.4 to 3.8 of the report. |
|
This report informs the Executive of the outcome of the statutory proposal to alter St Joseph’s Catholic Primary School through permanent expansion from September 2014 and recommends that it be approved. Additional documents: Decision: (i) that approval be given to the permanent expansion of St Joseph’s Catholic Primary School (Voluntary Aided) by one form of entry from September 2014, conditional upon the grant of full planning permission under the Town and Country Planning Act 1990 by December 2013 or other such date as agreed by the Director of Children and Families and the Strategic Director of Regeneration and Growth. (ii) that it be noted thatthe reason for approving the alteration of St Joseph’s Catholic Primary School is to provide permanent primary places in areas of the borough which have severe shortages of Reception and Year 1 school places. Minutes: The report from the Acting Director of Children and Families informed the Executive of the outcome of the statutory proposal to alter St Joseph’s Catholic Primary School through permanent expansion from September 2014 and recommended that it be approved. The Governing Body of St Joseph’s Catholic Primary School was in agreement with the Diocese of Westminster and in partnership with Brent Local Authority had proposed to alter the school by adding one form of entry. Councillor Pavey (Lead Member, Children and Families) expressed concern at the number of children who were without a school place and stated that the expansion was the latest instalment in the programme. He commended the school and the Governing Body who were both in favour of the expansion, as were the majority of parents.
RESOLVED:
(i) that approval be given to the permanent expansion of St Joseph’s Catholic Primary School (Voluntary Aided) by one form of entry from September 2014, conditional upon the grant of full planning permission under the Town and Country Planning Act 1990 by December 2013 or other such date as agreed by the Director of Children and Families and the Strategic Director of Regeneration and Growth;
(ii) that it be noted that the reason for approving the alteration of St Joseph’s Catholic Primary School was to provide permanent primary places in areas of the borough which have severe shortages of Reception and Year 1 school places. |
|
Cycle Training Contract Tender PDF 99 KB This report concerns the procurement of a cycle training provider for adults and children in Brent. It seeks authority to invite tenders and delegate authority to the Strategic Director of Environment and Neighbourhoods to award a contract. Decision: (i) that approval be given to officers to invite tenders to provide cycle training for adults and children; (ii) that approval be given to the proposed evaluation criteria set out in paragraph 5.1 of the report. (iii) that approval be given to delegate authority to the Strategic Director of Environment and Neighbourhoods to award the contract, subject to notification of the award on the Executive Forward Plan. Minutes: The Strategic Director, Environment and Neighbourhoods introduced her report which concerned the procurement of a cycle training provider for adults and children in Brent. It sought authority to invite tenders and delegate authority to award a contract. The Director referred to the funding received for cycling programme which she was very keen to encourage as it was a sustainable form of transport, beneficial for health and was one the council’s priority sports.
RESOLVED:
(i) that approval be given to officers to invite tenders to provide cycle training for adults and children;
(ii) that approval be given to the proposed evaluation criteria set out in paragraph 5.1 of the report from the Strategic Director, Environment and Neighbourhoods;
(iii) that approval be given to delegate authority to the Strategic Director of Environment and Neighbourhoods to award the contract, subject to notification of the award on the Executive Forward Plan. |
|
Appointment of Certificated Bailiffs for the collection of Penalty Charge Notice debts PDF 96 KB This report seeks approval of the Executive to award contracts for the provision of certified bailiff services for the collection of unpaid debts in relation to parking and traffic Penalty Charge Notices as required by Standing Order 88. This report summarises the procurement approach followed by the London Borough of Ealing in collaboration with the London Borough of Brent and seeks approval to an exemption from the usual tendering requirements of Contract Standing Orders for the direct award of these service concession contracts. Decision: (i) that approval be given to the award of a contract for the recovery of parking debts, to Collect Services Limited (who will initially act as Primary Bailiffs) subject to satisfactory performance, for a period of 3 years with the option of extending the contract for a further 2 years; (ii) that approval be given to the award of contracts for the recovery of parking debts, to Newlyn PLC, Task Enforcement Limited, and J.B.W. Group Limited (who will initially act as Secondary Bailiffs) for a period of 3 years with the option of extending the contracts for a further 2 years; (iii) that the process proposed for changing the appointment of Primary Bailiffs described in paragraph 3.9 and delegate future decisions around this process to the Director of Environment and Neighbourhoods be noted; (iv) that approval be given to an exemption from the usual tendering requirements of Contract Standing Orders in respect of the direct award of contracts as detailed in (i) and (ii) above for the good financial and/or operational reasons set out in paragraphs 3.7 and 3.8 of the report. Minutes: The Strategic Director, Environment and Neighbourhoods, presented a report which sought approval to award contracts for the provision of certified bailiff services for the collection of unpaid debts in relation to parking and traffic Penalty Charge Notices as required by Standing Order 88. He reminded the Executive that there was a distinction between certified bailiffs and debt collectors and anticipated that the approach should be good value for money. The report also outlined why the approach to selecting certified bailiff services represented good value for the Local Authorities involved in the process on the basis that the method of allocating warrants attracts added value commitments from the Primary Bailiff.
RESOLVED:
(i) that approval be given to the award of a contract for the recovery of parking debts, to Collect Services Limited (who will initially act as Primary Bailiffs) subject to satisfactory performance, for a period of three years with the option of extending the contract for a further two years;
(ii) that approval be given to the award of contracts for the recovery of parking debts, to Newlyn PLC, Task Enforcement Limited, and J.B.W. Group Limited (who will initially act as Secondary Bailiffs) for a period of three years with the option of extending the contracts for a further two years;
(iii) that the process proposed for changing the appointment of Primary Bailiffs described in paragraph 3.9 and delegate future decisions around this process to the Strategic Director of Environment and Neighbourhoods be noted;
(iv) that approval be given to an exemption from the usual tendering requirements of Contract Standing Orders in respect of the direct award of contracts as detailed in (i) and (ii) above for the good financial and/or operational reasons set out in paragraphs 3.7 and 3.8 of the report. |
|
Delegation of Powers to Birmingham City Council PDF 128 KB Thisreport seeks approval for the London Borough of Brent to authorise Birmingham City Council to investigate and institute proceedings against illegal money lenders operating within the Brent Council area. Decision:
(i) that approval be given to delegate to Birmingham City Council the function of the enforcement of Part III of the Consumer Credit Act 1974 within the London Borough of Brent and delegate to Birmingham City Council the power to institute criminal proceedings for any matters associated with illegal money lending or discovered during investigations by the Illegal Money Lending Team (ILMT) at Birmingham City Council; (ii) that approval be given to the “Protocol for Illegal Money Lending Team Investigations” attached as Appendix 1 and delegate authority to Strategic Director of Environment and Neighbourhoods in consultation with the Head of Consumer & Business Protection to enter into the protocol agreement on behalf of the London Borough of Brent with Birmingham City Council and, if required, approve minor alterations. Minutes: The report from the Strategic Director of Environment and Neighbourhoods sought approval for the London Borough of Brent to authorise Birmingham City Council to investigate and institute proceedings against illegal money lenders owperating within the Brent Council area. Councillor Mashari (Lead Member, Environment and Neigbourhoods) hoped that more could be done to help victims and promote credit unions given that poorest and most vulnerable were likely to suffer the most and welcomed the initiative which targeted illegal money lending activity and brought actions against those involved,
RESOLVED:
(i) that approval be given to delegate to Birmingham City Council the function of the enforcement of Part III of the Consumer Credit Act 1974 within the London Borough of Brent and delegate to Birmingham City Council the power to institute criminal proceedings for any matters associated with illegal money lending or discovered during investigations by the Illegal Money Lending Team (ILMT) at Birmingham City Council;
(ii) that approval be given to the “Protocol for Illegal Money Lending Team Investigations” attached as Appendix 1 and delegate authority to Strategic Director of Environment and Neighbourhoods in consultation with the Head of Consumer and Business Protection to enter into the protocol agreement on behalf of the London Borough of Brent with Birmingham City Council and, if required, approve minor alterations. |
|
This report provides an update on progress against the approvals given in earlier Executive committee meetings on the Schools Capital Portfolio/School Expansion Programme. This report specifically seeks approvals for delegated authority to award works contracts for projects in the Phase 2 Permanent Primary School Expansion Programme and a consultancy services contract for the Schools Capital Portfolio. Additional documents:
Decision: (i) that the update on school place planning and pupil projections be noted; (ii) that the update on the current status of the Temporary Primary School Expansion Programme 2013/14 be noted; (iii) that the update on the current status of the Phase 1 and 2 Permanent Primary School Expansion Programmes be noted; (iv) that authority be delegated to the Strategic Director of Regeneration & Growth in consultation with the Director of Legal & Procurement and the Lead Member for Regeneration & Growth to award the works contracts for the following Phase 2 Permanent Primary School Expansion projects: Harlesden Primary, St Josephs Primary, Wembley High Technology College and Preston Park Primary; (v) that in the event that the current procurement process referred to in paragraphs 3.16-3.24 fails to provide a tender that can be accepted, approval be given to a further procurement process via an open or restricted tender procedure through an OJEU advertisement as set out in Appendix 1, and agreement to the pre-tender considerations for this as set out in Appendix 2; (vi) that the update on the current status of the Phase 3 and 4 Permanent Primary School Expansion Programmes, in particular the inclusion of Islamia Primary School within the Phase 3 expansion programme be noted; (vii) that the update on the Secondary School Expansion Programme, including the Priority Schools Building Programme and free school be noted; (viii) that the update on the current status of Schools Capital Portfolio including SEN programme be noted; (ix) that authority be delegated to award a services contract for Project Management/Employers Agent services for the Schools Capital Portfolio using a framework to the Strategic Director of Regeneration & Growth in consultation with the Director of Legal & Procurement and the Lead Member for Regeneration & Growth. (x) that the Borough Solicitor be authorised to finalise and complete all required legal documentation in relation to the Phase 2 Permanent Primary School Expansion projects outlined in the report and in relation to the external project manager referred to at recommendation (ix). Minutes: Councillor Crane (Lead Member, Regeneration and Major Projects) outlined progress of delivery of the Schools Capital Portfolio/School Expansion Programme. He was pleased to report that all on-time applications had been offered a school place however there were 600 late applications and the number out of school was rising weekly. While progress was being made, the council still required further government assistance for additional funds as the borough could not keep pace with demand. Councillor Crane advised that governing bodies who had rejected expansion proposals may be asked to reconsider.
Members supported Councillor McLennan’s view that the importance of the applying for a school place before the deadline should be publicised and reinforced.
The Executive also had before them appendices to the report which were not for publication as they contained the following categories of exempt information as specified in Schedule 12 of the Local Government (Access to Information Act) 1972:
Information relating to the financial or business affairs of any particular person (including the authority holding that information);
Information in respect of which a claim to legal professional privilege could be maintained in legal proceedings
RESOLVED:
(i) that the update on school place planning and pupil projections be noted;
(ii) that the update on the current status of the Temporary Primary School Expansion Programme 2013/14 be noted;
(iii) that the update on the current status of the Phase 1 and 2 Permanent Primary School Expansion Programmes be noted;
(iv) that authority be delegated to the Strategic Director of Regeneration and Growth in consultation with the Director of Legal and Procurement and the Lead Member for Regeneration and Growth to award the works contracts for the following Phase 2 Permanent Primary School Expansion projects: Harlesden Primary, St Joseph’s Primary, Wembley High Technology College and Preston Park Primary;
(v) that in the event that the current procurement process referred to in paragraphs 3.16-3.24 fails to provide a tender that can be accepted, approval be given to a further procurement process via an open or restricted tender procedure through an OJEU advertisement as set out in Appendix 1, and agreement to the pre-tender considerations for this as set out in Appendix 2;
(vi) that the update on the current status of the Phase 3 and 4 Permanent Primary School Expansion Programmes, in particular the inclusion of Islamia Primary School within the Phase 3 expansion programme be noted;
(vii) that the update on the Secondary School Expansion Programme, including the Priority Schools Building Programme and free school be noted;
(viii) that the update on the current status of Schools Capital Portfolio including SEN programme be noted;
(ix) that authority be delegated to award a services contract for Project Management/Employers Agent services for the Schools Capital Portfolio using a framework to the Strategic Director of Regeneration and Growth in consultation with the Director of Legal and Procurement and the Lead Member for Regeneration and Growth;
(x) that the Borough Solicitor be authorised to finalise and complete all required legal documentation in relation ... view the full minutes text for item 14. |
|
Award of Contract for Mail Services PDF 111 KB This report requests authority to award contracts as required by Contract Standing Order No 88. This report summarises the process undertaken in selecting the supplier for the contracts and recommends to whom the contracts should be awarded. Additional documents:
Decision: (i) that the Council’s participation in a collaborative procurement under a framework agreement for contracts for mail services be noted; (ii) that approval be given to the award of a contract for Collection and Delivery of Mail to Royal Mail Group Limited, for a period of two years from 1st December 2013 with an option to extend from 1st December 2015 to 9th August 2016; (iii) that approval be given to the award of a contract for Hybrid Mail to Royal Mail Group Limited, for a period of two years from 1 December 2013 with an option to extend from 1 December 2015 to 9 August 2016. Minutes: The report from the Strategic Director of Regeneration and Growth requested authority to award contracts as required by Contract Standing Order No 88a, summarised the process undertaken in selecting the supplier for the contracts and recommended to whom the contracts should be awarded. Councillor Denselow (Lead Member, Customers and Citizens) welcomed the contract awarded in collaboration with other London Boroughs and which had been competitive both in quality and price. All the council’s mail would now be delivered by a single supplier.
The Executive also had before them an appendix to the report which was not for publication as it contained the following category of exempt information as specified in Schedule 12 of the Local Government (Access to Information Act) 1972:
Information relating to the financial or business affairs of any particular person (including the authority holding that information).
RESOLVED:
(i) that the Council’s participation in a collaborative procurement under a framework agreement for contracts for mail services be noted;
(ii) that approval be given to the award of a contract for Collection and Delivery of Mail to Royal Mail Group Limited, for a period of two years from 1 December 2013 with an option to extend from 1 December 2015 to 9 August 2016;
(iii) that approval be given to the award of a contract for Hybrid Mail to Royal Mail Group Limited, for a period of two years from 1 December 2013 with an option to extend from 1 December 2015 to 9 August 2016. |
|
South Kilburn Regeneration Programme PDF 259 KB This report summarises the progress made on the regeneration of South Kilburn and sets out approvals required by the Executive to further progress projects within Phases 2 and 3 of the regeneration programme. Additional documents:
Decision: (i) That the Executive note the progress made on the South Kilburn Regeneration Project as set out in this report. Phase 1b Recommendations (ii) That the Executive note the Strategic Director of Regeneration & Growth's proposed amendments to the Development and Sales Agreement with Catalyst Housing Ltd in relation to former Cambridge Court, Wells Court and Ely Court and Bond Hicks Bolton and Wood House (together defined as Phase1b), as set out in section 3 below. (iii) That the Executive authorise recycling the Phase 1b overage payment back into the South Kilburn Regeneration Programme to enable the early acquisition of leasehold interests. Site 18 Recommendations (iv) Members are asked to note that if the Hybrid Parliamentary High Speed 2 (HS2) Bill ('HS2 Bill') once laid includes provision for a ventilation shaft on Site 18, that the question as to whether to oppose the HS2 Bill will be put to Full Council. Post Office Plus Site Recommendations (v) That the Executive delegate authority to the Strategic Director of Regeneration and Growth in conjunction with the Borough Solicitor and the Chief Finance Officer to enter into a Collaboration Agreement with Woodville Properties the landowner of 5-9 Chippenham Gardens and the Post Office site to bring forward a comprehensive redevelopment of 5-9 Chippenham Gardens and the Post Office site with the Council's adjoining land at 4-26 Stuart Road (together defined as the 'Post Office Plus Site') as shown edged red on Plan A at Appendix 1. (vi) That the Executive authorise the removal of 4-26 Stuart Road as shown edged red on Plan B at Appendix 1, from the South Kilburn Regeneration Programme if the Strategic Director of Regeneration and Growth in conjunction with Borough Solicitor and Chief Finance Officeris unable to agree and enter into a Collaboration Agreement with Woodville Properties in respect of Post Office Plus Site. [Recommendations (vii) to (ix) are subject to entering into a Collaboration Agreement with Woodville Properties in respect of the Post Office Plus Site]; (vii) That the Executive award a contract for a full architectural design team to PRP Architects to lead the design team through to a full planning application (RIBA Stage 3) for the redevelopment of the Post Office Plus Site. (viii) That the Executive authorise the Director of Regeneration and Growth to develop a draft allocation policy for allocating homes to secure tenants living within 4 -26 Stuart Road. (ix) That the Executive authorise the Director of Regeneration and Growth to commence statutory consultation with secure tenants residing in 4-26 Stuart Road on three proposals (i) statutory consultation in connection with seeking approval of the Secretary of State for use of Ground 10A of Schedule 2 to the Housing Act 1985 (“Ground 10A”) (ii) consultation on the Council's proposal to make a CPO on properties in 4 - 26 Stuart Road that are currently occupied by secure tenants (iii) consultation in connection with the draft allocation policy for allocating homes to secure tenants ... view the full decision text for item 16. Minutes: In introducing the report from the Strategic Director of Regeneration and Growth, Councillor Crane (Lead Member, Regeneration and Major Projects) summarised the progress made on the regeneration of South Kilburn and sets out approvals required by the Executive to further progress projects within Phases 2 and 3 of the regeneration programme. He was particularly pleased with the plans for a health centre in Peel Precinct at neutral costswhich had been long awaited. An issue of concern was the plan for a ventilation shaft on the Queens Park site for HS2 and discussions were taking place to identify an alternative location. Should the council have to petition the bill before parliament, a report would be submitted to Full Council.
Councillor Denselow (Lead Member, Customers and Citizens) thanked the Director and his team for work on basement development policy guidance that had particularly assisted residents in his ward, Queens Park. Regarding the ventilation shaft, members present questioned the alternative site and the extent to which it was a suitable alternative. It was noted that consultation would take place.
The Executive also had before them an appendix to the report which was not for publication as it contained the following category of exempt information as specified in Schedule 12 of the Local Government (Access to Information Act) 1972:
Information relating to the financial or business affairs of any particular person (including the authority holding that information).
RESOLVED:
(i) that the progress made on the South Kilburn Regeneration Project as set out in this report be noted;
Phase 1b Recommendations
(ii) that the Strategic Director of Regeneration and Growth's proposed amendments to the Development and Sales Agreement with Catalyst Housing Ltd in relation to former Cambridge Court, Wells Court and Ely Court and Bond Hicks Bolton and Wood House (together defined as Phase1b), as set out in section 3 below be noted;
(iii) that approval be given to the recycling the Phase 1b overage payment back into the South Kilburn Regeneration Programme to enable the early acquisition of leasehold interests;
Site 18 Recommendations
(iv) that it be noted that if the Hybrid Parliamentary High Speed 2 (HS2) Bill ('HS2 Bill') once laid includes provision for a ventilation shaft on Site 18, that the question as to whether to oppose the HS2 Bill will be put to Full Council;
Post Office Plus Site Recommendations
(v) that authority be delegated to the Strategic Director of Regeneration and Growth in conjunction with the Borough Solicitor and the Chief Finance Officer to enter into a Collaboration Agreement with Woodville Properties the landowner of 5-9 Chippenham Gardens and the Post Office site to bring forward a comprehensive redevelopment of 5-9 Chippenham Gardens and the Post Office site with the Council's adjoining land at 4-26 Stuart Road (together defined as the 'Post Office Plus Site') as shown edged red on Plan A at Appendix of the report from the Director of Regeneration and Growth;
(vi) that approval be given to the removal of 4-26 Stuart Road as shown ... view the full minutes text for item 16. |
|
South Kilburn Regeneration Decentralised Energy Project PDF 172 KB This report concerns the proposed procurement of an Energy Supply Company (‘ESCo’) to deliver the South Kilburn decentralised energy system to install, manage and maintain the system and deliver heat to all properties developed as part of the regeneration of South Kilburn (referred to as ‘the Project’). Additional documents:
Decision: (i) that the progress made on the South Kilburn Decentralised Energy System Project be noted; (ii) that approval be given tp the Strategic Director of Regeneration and Growth to undertake a competitive procurement procedure (similar to the Competitive Dialogue procedure (as set out in the Public Contracts Regulations 2006) to procure an Energy Supply Company (‘ESCo’) to deliver the Project; (iii) that approval be given to the evaluation criteria as set out in this report which will form the basis for evaluation of the bids and the ultimate selection of the ESCo to deliver the Project. Further, that the Executive approves the Strategic Director of Regeneration and Growth to develop the detailed evaluation methodology and respective weightings to be applied to the evaluation criteria, within the parameters of the evaluation criteria set out in this report, prior to recommencement of the procurement process. (iv) that a consultancy contract be awarded to to Parsons Brinckerhoff Ltd to project manage the delivery of the project, advise on and provide commercial and strategic financial advice in respect of the project. Minutes: The report from the Strategic Director of Regeneration and Growth concerned the proposed procurement of an Energy Supply Company (‘ESCo’) to deliver the South Kilburn decentralised energy system to install, manage and maintain the system and deliver heat to all properties developed as part of the regeneration of South Kilburn (referred to as ‘the Project’). It sought the Executive’s approval to alter the procurement process in respect of the Project as required by Contract Standing Orders 88 and 89 and sought approval to procure an ESCo to deliver the Project through a competitive procedure similar to the Competitive Dialogue procedure (as set out in the Public Contracts Regulations 2006). The report also sought approval to award a consultancy contract to Parsons Brinckerhoff Ltd to project manage the delivery of the project, advise on and provide commercial and strategic financial advice in respect of the Project.
The Executive also had before them appendices to the report which were not for publication as they contained the following category of exempt information as specified in Schedule 12 of the Local Government (Access to Information Act) 1972:
Information relating to the financial or business affairs of any particular person (including the authority holding that information).
RESOLVED:
(i) that the progress made on the South Kilburn Decentralised Energy System Project be noted;
(ii) that approval be given tp the Strategic Director of Regeneration and Growth to undertake a competitive procurement procedure (similar to the Competitive Dialogue procedure (as set out in the Public Contracts Regulations 2006) to procure an Energy Supply Company (‘ESCo’) to deliver the Project;
(iii) that approval be given to the evaluation criteria as set out in this report which will form the basis for evaluation of the bids and the ultimate selection of the ESCo to deliver the Project. Further, that the Executive approves the Strategic Director of Regeneration and Growth to develop the detailed evaluation methodology and respective weightings to be applied to the evaluation criteria, within the parameters of the evaluation criteria set out in this report, prior to recommencement of the procurement process;
(iv) that a consultancy contract be awarded to to Parsons Brinckerhoff Ltd to project manage the delivery of the project, advise on and provide commercial and strategic financial advice in respect of the project. |
|
Mid-year treasury report 2013/14 PDF 101 KB This report updates Members on recent treasury activity. Decision: that the 2013/14 mid-year Treasury report as also submitted to the Council and Audit Committee be noted. Minutes: Councillor R Moher (Lead Member, Resources) updated members on recent treasury activity. She highlighted the current position on Icelandic Bank loans and was pleased to report that £4m of the original £5m deposit to Glitner had been received and a further £1m remained ring fenced awaiting a decision. On Heritable, only £0.6 of the original £10m deposit remained outstanding. No losses were expected.
The Chief Finance Officer concurred that the council could be more optimistic than previously but no guarantees could be absolute.
RESOLVED:
that the 2013/14 mid-year Treasury report as also submitted to the Council and Audit Committee be noted. |
|
Reference of item considered by Call in Overview and Scrutiny Committee Minutes: None. |
|
Any other urgent business Notice of items to be raised under this heading must be given in writing to the Democratic Services Manager or his representative before the meeting in accordance with Standing Order 64. Minutes: None. |