Logo Skip to content
Home
The council and democracy
Democracy portal

ePetition details

Stop Asphalt Patching: Maintain Roe Green Village Pavements to Conservation Standards

  • Sign ePetition
  • Log in or register and sign the ePetition
  • Browse all current ePetitions
We the undersigned petition the council to The Roe Green Village Residents’ Association (RGVRA) requests that the London Borough of Brent: Conduct an operational asset review of public footway repair methods across the entire conservation area boundary to ensure future maintenance works align with the borough's duty to protect our shared heritage street scenes. Formally integrate the historic, uniform footpaths of the village into the council's upcoming planned capital improvement cycles. Establish a consistent, standard heritage repair policy that prioritises matching modular paving materials during routine maintenance to safeguard the uniform look and pedestrian safety of our historic garden suburb paths.

As the very first designated conservation area in the London Borough of Brent (designated November 1968), Roe Green Village holds unique historical value for our borough. The area possesses a highly consistent, unified residential character where traditional paving slabs have historically defined our shared public footways alongside our streets.

Over recent years, standard routine maintenance interventions have increasingly introduced mismatched, ad-hoc modern composite materials to patch damaged sections of these pathways. This piecemeal patching fragments the visual continuity and uniform layout of our protected local street scene across all seven constituent roads or parts thereof, within the conservation area boundary line: Bacon Lane, Goldsmith Lane, Roe End, Roe Lane, Scudamore Lane, Shorts Croft, and Stag Lane.

Rather than seeking alternative adjudication for isolated historical maintenance events, this petition represents a collective community desire by local taxpayers to work constructively with the local authority. We wish to establish a clear, forward-looking policy framework that updates the standard of care for our historic paths, ensuring they are repaired using uniform materials that protect the area's visual integrity for generations to come.

By formally including the village footway network within upcoming capital infrastructure programs, the Council can ensure its asset management strategies seamlessly support the long-term preservation of our borough's unique heritage. We look forward to this petition being registered to open a positive dialogue on safeguarding our historic walkways.

Started by: Nicole Seidemann (Roe Green Village Residents’ Association (RGVRA))

This ePetition runs from 23/11/2026 to 04/01/2027.

Nobody has yet signed this ePetition.

 

Navigation

  • ePetition - Stop Asphalt Patching: Maintain Roe Green Village Pavements to Conservation Standards
  • What's new
  • Committees
  • Constitution
  • Calendar
  • Meetings
  • Committee decisions
  • Officer Decisions
  • Forward plans
  • Your Councillors
  • Your MPs
  • Election Results
  • Outside bodies
  • Search documents
  • Subscribe to updates
Brent homepage
Your council
Complaints and feedback Contact the council Jobs at the council News and Press office Sign up to our weekly email news updates
My Account
Manage your Council Tax, housing benefits, council rent account and more through My Account.
Sign in or register
Follow us on social
Brent Council's Facebook page Brent's Instagram page Brent Council's LinkedIn site Brent council's Twitter feed Brent council's YouTube channel
Accessibility statement Cookies policy Privacy policy Terms of use
© Copyright Brent Council 2022

Title