Issue - meetings
Shopfronts Supplementary Planning Document (SPD3) Adoption
Meeting: 18/06/2018 - Cabinet (Item 7)
7 Shopfronts Supplementary Planning Document (SPD3) Adoption PDF 93 KB
The paper outlines the consultation responses received between 1 February 2018 and 15 March 2018 on the draft Shopfronts Supplementary Planning Document (SPD3). The consultation responses received have resulted in some minor amendments, with revised text now providing clearer guidance. When adopted by Cabinet the document will replace the existing Brent Shop fronts and shop signs (SPG7) adopted in 2003, which will need to be revoked.
Additional documents:
- 07a. Appx 1 - SPD3 Shopfronts - Consultation Statement, item 7 PDF 196 KB
- 07.b Appx 2 - SPD3 Shopfronts, item 7 PDF 12 MB
- 07c. Appx 3 - SPD3 Shopfronts - Equality Analysis, item 7 PDF 100 KB
Decision:
RESOLVED:-
7.1 that Cabinet approves the proposed amendments as set out in Appendix 1 and adopts the Shopfronts Supplementary Planning Document (SPD3) as set out in Appendix 2.
7.2 that Cabinet revokes the existing Brent Shop fronts and shop signs (‘SPG7’) adopted in 2003.
Minutes:
Councillor Shama Tatler, Cabinet Member for Regeneration, Highways and Planning, introduced the report stating that the paper outlines the consultation responses received between 1 February 2018 and 15 March 2018 on the draft Shopfronts Supplementary Planning Document (SPD3).
The consultation responses received have resulted in some minor amendments, with revised text now providing clearer guidance. When adopted by Cabinet the document will replace the existing Brent Shop fronts and shop signs (SPG7)adopted in 2003, which will need to be revoked.
RESOLVED:
7.1 that Cabinet approves the proposed amendments as set out in Appendix 1 and adopts the Shopfronts Supplementary Planning Document (SPD3) as set out in Appendix 2.
7.2 that Cabinet revokes the existing Brent Shop fronts and shop signs (‘SPG7’) adopted in 2003.